Kavling C4

Detail Kavling C4

Luas Tanah

208,15 m²

Merah — Kritis — 8.9%

Progress Material

MaterialTargetTerpakai%
Semen Imasco 40 KG 88,0 sak 0,0 sak 0%
Besi 10 55,0 lonjor 0,0 lonjor 0%
Besi 8 30,0 lonjor 0,0 lonjor 0%
Bata Ringan 18,0 m3 2,0 m3 11.1%
Mortar 18,0 sak 0,0 sak 0%
Acian 11,0 sak 1,0 sak 9.1%
Genteng 425,0 Buah 200,0 Buah 47.1%
Wuwung 18,0 Buah 0,0 Buah 0%
Pasir Pasang 14,0 m3 0,0 m3 0%

Input Realisasi Pemakaian

Riwayat Realisasi

TanggalMaterialJumlahCatatan
29 Jul 2026 Genteng 200,00 Buah -
29 Jul 2026 Bata Ringan 2,00 m3 -
29 Jul 2026 Acian 1,00 sak -